Projects
Below is a brief, selected listing of projects on which CJI has provided engineering and consulting services. In addition, CJI also provides expert witness testimony and has a long track record of success in court proceedings and administrative hearings.
For more information on CJI’s breadth of expertise and project history, please contact the Subject Matter Experts in the categories below.
AIR QUALITY PROJECTS
New Source Review Permit Renewal and Amendment Applications for a research and development chemical manufacturing facility and a semiconductor manufacturing facility | Central Texas
US EPA Risk Management Plan development and submittal for a complex chemical manufacturing facility subject to OSHA PSM standards | Houston
Annual Emissions Inventories and Toxic Release Inventory Reporting for chemical and industrial hazardous waste facilities | West Texas and East Texas
Regulatory review and compliance evaluation for a major source oil and gas midstream facility | North Texas
Permit by Rule (PBR) registration and memorandum packages for a multitude of industries | Various
Please contact Joe Pere for more information.
INDUSTRIAL SOLID WASTE MANAGEMENT PROJECTS
RCRA Hazardous Waste Permit and Compliance Plan Renewal and Amendment Application for a commercial industrial hazardous waste management facility | Southeast Texas
RCRA Hazardous Waste Permit and Compliance Plan Renewal and Amendment Application for a manufacturing facility approved by TCEQ in 2015 | North Texas
Please contact Kathy McGee, P.E. for more information.
MUNICIPAL SOLID WASTE MANAGEMENT PROJECTS
Type I Municipal Solid Waste Landfill Permit Application for a new (Greenfield) facility; public hearing on the final draft permit prepared by the TCEQ concluded in 2016; final action by TCEQ pending recommendation from the State Office of Administrative Hearings. | Central Texas
Type V Municipal Solid Waste Registration Applications for multiple medical waste management facilities approved by TCEQ in 2015; coordinated pre-opening inspections for the facilities. | West and Southeast Texas
Please contact Kathy McGee, P.E. for more information.
ENVIRONMENTAL ASSESSMENTS AND REMEDIATION
Investigation, Remedial Planning and Remediation Oversight for a manufacturing facility with a release of trichloreoethane to soil and groundwater. Post-response groundwater monitoring activities are continuing at the site in 2016. | North Texas
Phase I Environmental Site Assessments (ESAs) on three large tracts of land were completed in 2013 – 2014 to facilitate enrolling the properties into TCEQ’s Voluntary Cleanup Program. | North Texas
Please contact Corey Klingelhefer, P.E. for more information.
GROUNDWATER/GEOLOGY
Evaluation of Slurry Wall and Groundwater Recovery System Effectiveness for containment of contaminants and restoration of groundwater quality. Results reported to the TCEQ semi-annually. | South Texas
Investigation, Remediation, Regulatory Reporting, and Closure of a LPST site in 2010. | North Texas
Please contact Kevin Lonseth, P.G. for more information.
HYDROLOGY, HYDRAULICS, AND STORMWATER MANAGEMENT
Investigation, Preliminary Design and Options Analyses for improvements to the storm water retention systems for a specialty chemical research and production facility to satisfy state and federal industrial stormwater discharge requirements. | North Texas
Performed mapping delineations from aerial topography of an approximately 1400 acre watershed containing dune structures, playas, shallow draws, large earthen stockpiles, ponds, a railroad loop, roads, developed ditch systems of varying size and slope, buildings and landfill structures in order to develop HEC-HMS models to determine the extent and elevations of floodplains resulting from the 100-year, 24-hour return frequency rainfall event, the 500-year, 24-hour return frequency rainfall event and the Probable Maximum Precipitation (PMP) 72-hour event. The PMP was statistically computed for the site.
Please contact Jeff Glaser, P.E. for more information.
WATER AND WASTEWATER PROJECTS
TPDES Major Permit Amendment Application for a commercial waste management facility approved by TCEQ in 2012. | West Texas
Design, Permitting and Construction Monitoring of stormwater detention and leachate evaporation ponds for a low level radioactive waste management facility and a commercial industrial waste management facility in 2012 -2014. | West Texas.
Please contact Jeff Glaser, P.E. for more information.